logo
Send Message
Home > products > ENGINE TURBO CHARGER >
RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA

RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA

RHF3 V2607 ENGINE TURBO CHARGER

1J700-17010 ENGINE TURBO CHARGER

1J700-17011

Place of Origin:

China

Brand Name:

HDPARTS

Model Number:

RHF3 V2607

Contact Us

Request A Quote
Product Details
After Warran:
Online Support
OEM Service:
Available
Packing:
Plastic Bag , Box , Carton
Place Of Origin:
China
Application:
Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type::
Diesel
Marketing Type::
Hot Product
Payment & Shipping Terms
Minimum Order Quantity
1 pc
Price
Looking forward to your inquiry
Packaging Details
Plastic bag , Box , Carton
Delivery Time
2-5 work days
Payment Terms
T/T, Western Union, MoneyGram,HSBC
Supply Ability
1000 Piece/Pieces per Month
Product Description

RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA

Specification

Applicable models RHF3 V2607
Type Engine turbocharger
Original number 1J700-17010 1J700-17011 1J700-17012
Warranty 6 months
Engine Type Diesel
Brand Name HDPARTS
Condition New
Size OEM Size

 

Equipment replacement Check the turbocharger. Check whether the model of the new turbocharger matches the engine. Rotate the turbocharger rotor by hand and it should run freely. If the impeller is sluggish or has the feeling of rubbing the shell, find out the reason and then install it.
 

Check whether there are sundries in the intake pipe of the compressor and the exhaust pipe of the engine in front of the turbine to prevent the impeller from being damaged by the sundries.

Check the oil inlet pipe and oil return pipe of the supercharger. The oil inlet and return pipes of the supercharger shall be clean, and the oil inlet and return pipes shall not be twisted and blocked. If a sealing gasket is used for the oil inlet and return port of the supercharger, check whether the gasket is corroded and deformed. The gasket cannot block the oil inlet and return port.

 

 

 
Product Description
RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA 0RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA 1
 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RHF3 V2607 ENGINE TURBO CHARGER 1J700-17010 1J700-17011 1J700-17012 For KUBOTA 2
RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

 

Send your inquiry directly to us

Privacy Policy China Good Quality ENGINE SPARE PART Supplier. Copyright © 2022-2025 parts-hd.com . All Rights Reserved.