Place of Origin:
China
Brand Name:
HDPARTS
Model Number:
6D125 PC400-6
Contact Us
6D125 PC400-6 Diesel Cylinder Head 6151-12-1102
Specification
Applicable models |
6D125 PC400-6 |
Type | Cylinder Head |
Original number | 6151-12-1102 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
1. The cylinder head bolt should be evenly tightened, and the oil supply time should be adjusted correctly.2. Soft water should be added to the water tank, and the water should be changed as little as possible.3. The diesel engine should avoid working under overload for a long time.4. When the engine is working and the water tank occasionally lacks water, it should not be turned off immediately, but should be slowly added at low speed. Do not add cold water after the engine is hot, and wait for the water temperature to reach below 40 °C after stopping. Boiling water cannot be added immediately when starting in winter, but boiling water should be heated first.
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Send your inquiry directly to us